OEM Best electrical power monitoring system Manufacturers – GDYB-S3 Three Phase Energy Meter Test System (3 positions) – HV Hipot
OEM Best electrical power monitoring system Manufacturers – GDYB-S3 Three Phase Energy Meter Test System (3 positions) – HV Hipot Detail:


Technical Specification
System accuracy: 0.1%;
Three phase source parameter:
a. Output voltage:
3*57.7VY 3*100V ∆ ;
3*220V Y 3*380V ∆;
Adjustable range 0~120% continuously adjustable
Adjustment fineness: better than 0.01%
b. Output current: 25mA, 0.1A, 1A, 5A, 25A,100A;
Adjustable range 0~120% continuously adjustable
Adjustment fineness: better than 0.01%
Mininum output current: 1mA (accuracy: <5%)
c. Output power: (voltage circuit) 3 * 50VA
(current circuit) 3 * 150VA
d. Output voltage, current, power stability: ≤0.02%/120S
e. Distortion degree of output voltage and current waveform: ≤0.5%
f. Symmetry of three phase angles: between 120°±0.3°
g. Frequency range: 45Hz~ 65Hz, step: 0.01Hz
h. Phase angle range: -180°~ 180°, step: 0.01°
i. Indicating metter accuracy: Voltmeter, ammeter: ±0.01%
Phase meter: ±0.01°
Frequency meter: ±0.01Hz
Minimum Output current: 1mA; accuracy: ≤5%;
Output load capacity (20 meters)
Voltage output: 800VA;
Current output: 2500VA;
Voltage & current adjustment
Adjustable range: (0%~120%) x measuring range;
Adjustable fineness: 10%, 1%, 0.1%, 0.01%;
Phase adjustment:
Adjustable range: 0°~360°;
Adjustable fineness: 10°, 1°, 0.1°, 0.01°;
Frequency adjustment:
Adjustable range: 45Hz~65Hz;
Adjustable fineness: 1Hz, 0.1Hz, 0.01Hz;
Output power stability: ≤0.05%/120S;
Output voltage & current distortion:
Voltage: ≤0.5%;
Current: ≤0.5%;
Harmonic settings:
Harmonic number: 2~21 times;
Harmonic content: current 2~21 times ≤40% (relative to fundamental wave);
voltage 2~21 times ≤40% (relative to fundamental wave);
Harmonic phase: 0°~359.99°;
Monitoring instrument:
Standard meter display accuracy: Voltage: 0.01%;
Current: 0.01%;
Power: 0.01%;
Phase: 0.01;
Frequency: 0.01;
Insulated 1:1 current transformer parameter:
Accuracy: 0.01%;
Output power: 60VA;
Current measuring range: 1mA~120A (1:1);
Main performance index
a) Accuracy: 0.01% (COS∮=0.5C…1…0.5L);
b) Rated frequency: 50Hz/60Hz±5%;
c) Primary current: 3×0.001-120A;
d) Secondary current: 3×0.001-120A;
e) Output load (each phase):
0.5W (output range: 0.001-1A);
0.7V divided by current value (output range: 1-120A);
f) Output load voltage: Max. 0.5V (output current Max. 120A);
Current transformer dimension: 265 x 200 x 240 mm (L x W x H);
Weight: 12kg;
Dimension:
Control source: 610 x 800 x 1920mm (L x W x H);
Meter rack: 2350 x 750 x 1850mm (L x W x H);
Product detail pictures:
Related Product Guide:
That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for OEM Best electrical power monitoring system Manufacturers – GDYB-S3 Three Phase Energy Meter Test System (3 positions) – HV Hipot , The product will supply to all over the world, such as: belarus, Philippines, Cyprus, By continuous innovation, we will provide you with more valuable products and services, and also make a contribution for the development of the automobile industry at home and abroad. Both domestic and foreign merchants are strongly welcomed to join us to grow together.
Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.





